Where the money goes
| Expense line | Per unit | Share | Year over year | Control |
|---|---|---|---|---|
| Taxes and insurance | $2,998 | 34.6% | +2.65% | Limited: appeals, bidding |
| Administrative and payroll | $2,323 | 26.8% | +3.81% | High |
| Utilities | $1,304 | 15.1% | −3.2% | Moderate |
| Repairs and maintenance | $1,098 | 12.7% | +3.7% | High |
| Other | $934 | 10.8% | n/a | Varies |
| Total | $8,657 | 100% | +2.2% |
Your figures will vary by age, market and type, so these are useful for orientation only.1 The insurance line deserves attention in its own right: it rose 10.8% to $777 per unit in 2024, following a 25% increase in 2023.1
Repairs and maintenance
- Shift from emergency to planned. Track the share of work orders that are emergencies, and their cost, compared with planned work.
- Watch equipment. Runtime and usage drift can flag trouble before failure.
- Standardize turns. Use common specifications and materials across the portfolio, and buy them together.
Payroll and administration
- Automate routine work. Leasing follow-up, invoice coding and routine requests can absorb a lot of staff hours.
- Share staff across nearby properties where the layout and workload allow it.
- Review overtime and allocations. Check what's being charged to each property.
The aim is rarely fewer people on site. It's the same people on more valuable work, and avoiding new hires as the portfolio grows.
Utilities
- Monitor for anomalies. A leak or stuck valve can quietly run for months.
- Review billing recovery. Where it's allowed, check that utility billing is working correctly.
- Compare by building. Usage differences between similar buildings point to problems.
Vendors and contracts
- Rebid the largest contracts on a regular schedule, using one scope for all bidders.
- Audit a sample of invoices for duplicates, off-contract pricing and miscoding.
- Bundle across properties to get better pricing from one vendor.
Taxes and insurance
These lines are large, and only partly controllable. Review assessments for appeal opportunities, and bid insurance with accurate property data. Small improvements here can be large in dollars.
Cuts that cost more later
| Tempting cut | The later cost |
|---|---|
| Deferring preventive maintenance | Emergency repairs and shorter equipment life |
| Stretching maintenance response | Lost renewals, at nearly $4,000 per turn2 |
| Thin staffing during peak leasing | Slow follow-up and longer vacancy |
| Cheaper turn materials | More frequent replacement, and weaker premiums |
In one Opennova case study, a mixed-use operator found $2.3M in expense optimization across 14 assets. On a 1,500-unit multifamily portfolio at the NAA average, each 1% reduction is about $130,000 a year. Our NOI guide ranks this alongside other levers.
