Common conventions
| Asset type | Convention per year | Evidence-based range |
|---|---|---|
| Multifamily | $250 per unit | $250 to $400+ per unit, by age |
| Retail | $0.15 per SF | $0.20 to $0.35 per SF |
| Office | $0.20 to $0.25 per SF, with TI and leasing costs separate | $0.15 to $0.25 per SF for Class A structural, higher for older stock |
| Industrial and small-bay flex | $0.05 to $0.15 per SF | Lease carve-outs can move six-figure replacements to the landlord |
| Self-storage | $0.12 to $0.15 per SF | Same range |
Treat these as starting floors. MMCG presents them as historical conventions, and your lender's documents and property condition assessment take priority.1 A flat $250 per unit may have no connection to what a 1985 garden community will really need.
Reserves and NOI
People disagree about where reserves belong, and the answer changes your value. Wall Street Prep describes the usual pattern: investors often exclude reserves from NOI so properties can be compared, lenders often include them for a more conservative figure, and sellers exclude them to support a higher price.2
| Wall Street Prep's example | Reserves excluded | Reserves included |
|---|---|---|
| NOI | $1.1M | $1.0M |
| Implied value at a 5% cap rate | $22M | $20M |
| DSCR | 1.26x | 1.15x |
So when comparing deals, confirm how each NOI figure was built. Then rerun coverage in our DSCR calculator using your lender's method.
Build a plan from the bottom up
- List major components: roofs, HVAC, paving, elevators, boilers, facades and unit interiors.
- Record age, condition and remaining life, using a PCA and service records.
- Estimate replacement cost with current bids where you can.
- Spread the cost over the years to replacement, and add an inflation assumption.
- Compare the result with what you're funding now.
| Component | Cost today | Years left | Annual funding |
|---|---|---|---|
| Roof, 60,000 SF | $540,000 | 6 | $90,000 |
| 10 rooftop units | $160,000 | 8 | $20,000 |
| Parking lot | $120,000 | 6 | $20,000 |
| Total | $820,000 | $130,000 |
That gap is the point of this exercise. A building can meet the lender's minimum and still be underfunded for what's coming. Add the shortfall to your hold-period capital plan, or you'll meet it later as a capital call. Our deferred maintenance guide shows how to rank what's already overdue.
Questions to ask your manager
- What did we fund, draw and leave unspent last year, and do those tie to the bank and lender statements?
- Are lender-held reserve draws being submitted on time?
- Have any planned replacements moved, and why?
- Are repairs being coded to capital in a way that flatters NOI?